16×16 deck plans
A 16 × 16 ft deck (36 in high): 133 boards to buy, 221 pieces to cut and 87–130 hours of work, about $3,317 at Home Depot.

YOU'LL BUILD · 16 FT × 16 FT, 36 IN HIGH
$3,317about, at Home Depot
- 133boards to buy
- 221pieces to cut
- 87–130hours · advanced
- 2x10joists, 12 in apart
- 3posts on 27 in footings
- 5risers to the ground
The full plan has the 3D drawing to turn and take apart, the cut list, cut maps for every board and sheet, and Garage mode for the build.
What it costs
Build it about $3,317 · a deck builder about $6,400–$12,800
You save about $3,085 building it.
Materials list
| Qty | Item | Size and use | Cost |
|---|---|---|---|
| 19× | 2x10 treated | 16 ft | $681.72 |
| 34× | 5/4 × 6 treated deck board | 16 ft | $468.52 |
| 4× | 5/4 × 6 treated deck board | 8 ft | $27.52 |
| 37× | 2x2 treated | 8 ft | $202.76 |
| 3× | 2x12 treated | 16 ft | $140.34 |
| 2× | 2x12 treated | 8 ft | $45.56 |
| 18× | 2x4 treated | 8 ft | $78.84 |
| 7× | 4x4 post, treated | 8 ft | $75.46 |
| 8× | 2x6 treated | 8 ft | $63.84 |
| 1× | 6x6 post, treated | 8 ft | $35.68 |
| 1× | Stair handrail | treated 2x2, 8 ft (a graspable 1 ½ in square) · one side, 34–38 in above the nosings | $5.48 |
| 31× | Concrete mix | 80 lb bag · 3 footings and 2 at the foot of the stairs | $191.27 |
| 5× | Concrete form tube | 12 in × 4 ft · tubes · the piers, cut to length | $99.90 |
| 3× | Post base | 6x6, adjustable standoff (Simpson ABA/ABW66Z) · on a ½ in wedge anchor in the cured pier | $125.34 |
| 1× | Wedge anchors | ½ × 5 ½ in galvanized, 10-pack · 3, one a post base | $29.89 |
| 3× | Post cap | for a 3-ply beam on a 6x6 (Simpson BCS2-3/6Z) | $53.76 |
| 17× | Hurricane tie | joist to beam (Simpson H2.5A / H2.5T) · one where each joist crosses a beam | $16.66 |
| 17× | Joist hanger | 2x10 (Simpson LUS210Z) · one a joist, on the ledger | $56.95 |
| 1× | Ledger lag screws | ½ × 4 in hot-dip galvanized, 25-pack · 19, every 11 in, staggered in 2 rows | $59.43 |
| 2× | Ledger flashing | galvanized Z-flashing, 10 ft · over the ledger, under the siding | $11.96 |
| 8× | Connector screws | #9 × 1 ½ in (Simpson SD9112), 50-pack · about 400, for the hangers, ties and caps | $115.52 |
| 3× | Exterior screws | #10 × 3 in, 1 lb box · beam plies, rim joists and stair treads | $41.94 |
| 4× | Exterior screws | #8 × 1 ⅝ in, 1 lb box · balusters (2 at each end) and the cap | $43.88 |
| 28× | Carriage bolts | ½ × 8 in galvanized · 2 a railing post | $139.44 |
| 1× | Hex nuts | ½ in galvanized · one a bolt | $25.98 |
| 2× | Flat washers | ½ in galvanized · 47: a bolt each, and the ledger lags | $44.90 |
| 14× | Hold-down | Simpson DTT2Z deck tension tie · 2 tie the deck to the house joists; one at each railing post, into 2x blocking | $194.18 |
| 3× | Stair stringer connector | Simpson LSCZ · stringer to the rim | $8.94 |
| 3× | Handrail bracket | galvanized | $132.72 |
| 3× | Deck screws | #9 × 2 ½ in, 5 lb box · about 1214, 2 at each joist | $98.91 |
Prices checked Nov 23 at a Home Depot in Atlanta, GA. They vary by store. The full plan adds the cut list and a cut map for every board.
How to build it
10 steps, about 87–130 hours (advanced). The letters are the parts on the cut list.
- Check the plan and get a permit. Most towns want a permit for a deck attached to the house or more than 30 in up. Take the framing plan above to the building department; ask for the frost depth and where your utility lines run (call 811 before you dig).
- Lay out and dig the footings. Mark the deck with strings on batter boards, starting from the house, square with a 3-4-5 triangle (or equal diagonals). Mark the 3 post centers from the framing plan and dig the holes 24 in deep (below your frost line), 27 in wide at the bottom for the footing pad.
- Pour the footings and set the post bases. Pour a 11 in thick pad in the bottom of each hole. Stand a 12 in form tube on it, 1 in above the ground, fill it and level the top. Let it cure 2 days, mark the post centers from the strings, drill each pier and set a wedge anchor, then bolt on the post bases.
- Fasten and flash the ledger. Take the siding off where the ledger goes. Level the ledger C so the decking ends up 1 in below the door sill, and screw it into the house's band joist with ½ in lag screws every 11 in, staggered top and bottom. Flash over it before the siding goes back. Never on brick veneer: build it freestanding instead.
- Set the posts and the beam. Stand the posts A in their bases, plumb them and cut them to height (12 ½ in). Build the 3-ply 2x12 beam B with 3 in screws every 16 in, crown up, joints over posts, and set it in the post caps.
- Hang the joists and the rim. Hang the joists D from the ledger in joist hangers and lay them on the beam, 12 in on center, crown up. Screw the rim E across the joist ends, 3 screws each, and tie each joist to the beam with a hurricane tie. Check the frame is square.
- Lay the decking. Start at the front with a straight board flush with the rim. Lay the boards F along the house with ⅛ in gaps, 2 screws at every joist. Rip the last board to fit at the house.
- Build the stairs. Pour two 12 in footings at the foot and lay a treated 2x4 bearing block G across them. Lay out the stringers H with a framing square: 5 risers of 7 ³⁄₁₆ in and treads 11 ⅛ in deep. Cut one, check it, then copy it. Hang them from the rim with stringer connectors, 3 across the 36 in width, and screw on the treads I, 2 boards a step.
- Build the railing. Bolt the railing posts J to the frame with 2 carriage bolts each and a hold-down into 2x blocking cut from joist offcuts, no more than 6 ft apart. Screw the rails LO between them, then the balusters K less than 4 in apart, and the cap MNPQR on top, 36 in above the deck. On the stairs, bolt a post S at the foot, run the sloped rail T and fill it with balusters U. Add a graspable handrail on one side of the stairs, 34–38 in above the nosings.
- Seal it. Treated wood needs a few weeks to dry. When water soaks in instead of beading, put on 2 coats of a deck stain and sealer, and again every 2–3 years.
Other sizes
Any other size: the deck planner.