When to winterize your home in Dallas

In Dallas, the first freeze (32 °F) comes around November 29 and the first hard freeze (28 °F) around December 12 in a typical year. Here's when to do each winter job so it's done in time.

Dallas, TX · a typical year
Nov 29first freeze (32 °F)
  • Dec 12first hard freeze (28 °F)
  • Mar 2last freeze in spring
  • 23nights a year at 32 °F or colder
  • 272days between the last spring and first fall freeze

Median dates: half of years freeze before them. Measured at the NOAA station Dallas Love Field, TX, 9 km from downtown (NOAA U.S. Climate Normals 1991–2020). Low spots and outer suburbs often freeze a week or two earlier: check your own ZIP.

Freeze alerts for my ZIP My home's full checklist

Dallas's home upkeep, in your calendar

Every job of the year on the right week for Dallas's weather: the outside faucets before the first freeze, the furnace filter, the smoke alarm test, the gutters. Each comes with the steps and a link. Free, no sign-up, and it keeps itself up to date.

Any other calendar app: subscribe to https://spetz.ai/winterize/dallas-tx/upkeep.ics

Before the freeze in Dallas: the dates

Each job is dated from Dallas's typical first freeze, by the same rules as our home maintenance checklist. They land on a Saturday, so the day moves a little each year.

  1. Oct 9about

    Heating tune-up before the cold

    ENERGY STAR advises servicing the heating system every fall, before you need it: a technician checks the gas, burner, heat exchanger and safety controls.

    Gas, burners and the heat exchanger are a licensed technician's job.

  2. Oct 30about

    Seal the drafts before winter

    Fall is the time to replace cracked caulk and worn weatherstripping, before the heating season.

  3. Nov 13about

    Shut off the outside faucets

    A hose bib left full freezes and splits inside the wall. Do it before the first freeze, which comes around November 29 in half of years.

  4. Dec 4about

    Blow out the sprinklers

    Water left in the lines freezes and cracks pipes, heads and the backflow valve. Do it before the first hard freeze, around December 12 in half of years.

    Blowing out takes a large compressor and the right pressure: many people hire it.

  5. Dec 11about

    Clean the gutters

    Clogged gutters overflow against the walls and foundation. Clean them in spring and after the leaves drop; with big trees nearby, more often.

    Second-story or steep roofs: hire it out rather than work from a tall ladder.

In spring

The last freeze in Dallas comes around March 2 in a typical year.

  1. Mar 20about

    Turn the outside water back on

    Wait until the freezes are over: the last one comes around March 2 in half of years.

  2. Mar 20about

    Start up the sprinklers

    Start up after the last freeze, and look for winter damage before the summer bill shows it.

The pipes that freeze first

If a pipe freezes: open the faucet, warm the pipe with a hair dryer or space heater (never an open flame), and know where the main shut-off is before it thaws. More in our frozen pipes guide (from the American Red Cross).

Nearby cities

Every city on one page: first freeze dates for 62 US cities.