Dry well: how big, where it can go

A dry well is a pit of clean stone wrapped in filter fabric where a downspout or a drain soaks into the ground. For roof water, use about 60 cu ft of stone per 1,000 sq ft of roof in coarse sand or gravel, 90 cu ft in medium sand, never less than 4 ft across (Clark County, WA). Keep it 10 ft from the house, the property line and a septic field, its bottom above the seasonal high water table, and don't build one in clay or silty soil: do a perc test first, and if water is still in the hole after a day, send the water to lower ground instead.

Dry well size by roof area

Dry well stone by roof area
Roof into itCoarse sand, gravelMedium sandStone (medium sand)
500 sq ft50 cu ft50 cu ft2.9 t
1,000 sq ft60 cu ft90 cu ft5.2 t
1,500 sq ft90 cu ft135 cu ft7.8 t
2,000 sq ft120 cu ft180 cu ft10.4 t

Never smaller than a pit 4 ft across and 4 ft deep (about 50 cu ft). Stone tons with 10% extra at 1.42 tons a cubic yard.

Will your soil take it? The perc test

  1. Dig a hole about 12 in deep where the dry well would go and fill it with water to soak the soil.
  2. The next day, fill it again and measure how fast it drops (UC IPM).
  3. 1 to 2 in an hour drains well. Under about ½ in an hour, or water still standing after a day: no dry well, send the water to lower ground or a pop-up emitter.

Before you dig: call 811, and check with your county. Some states register dry wells as Class V injection wells (EPA), and many cities don't allow one within reach of a storm sewer.

Sizing and setbacks from Clark County (WA) BMP T5.10A and Skagit County's stormwater guide; the perc test from UC IPM; dry wells are EPA Class V wells (rules vary by state).