Spetz Specs No. 4082: step-by-step build guide

Crib Mattress Porch Swing

The complete step-by-step guide made from EmyLuDesigns's YouTube video, free on Spetz. For the video, a step-by-step player and answers to your questions, see the Crib Mattress Porch Swing project page.

Crib Mattress Porch Swing

7 steps, 10 parts, 13 tools, 10 materials

Overview

Finished size: 58-1/2 in W x 33 in D x 19 in H

What You're Building

Why This Design Works

What It Takes

What Decides Success

Overall dimensions
Overall dimensions

Health and safety

Circular and Miter Saws

Drilling and Driving Screws

Sanding, Paint, and Finishes

Ceiling Joists and Suspension

Tools

Materials

Hardware

HardwareSizeCountUsed in steps
3 in Exterior wood screws~582, 3, 4, 5
3/8 in x 4-7/8 in Heavy-duty eye screws47
Heavy-duty S-hooks47

Cut list

PartNameQtySizeNotes
ABase front and back railx21 1/2" (T) × 3 1/2" (W) × 54 1/2" (L)90° crosscut both ends; installed on edge (3-1/2 in face vertical) at the front and back of the mattress box.
BBase end rail and interior slatx71 1/2" (T) × 3 1/2" (W) × 27 1/2" (L)90° crosscut both ends; 2 installed on edge between the ends of the 54-1/2 in rails to close the box, and 5 laid flat inside the box spaced 6-1/4 in apart flush with the bottom edge.
CSub-base back railx11 1/2" (T) × 3 1/2" (W) × 51" (L)90° crosscut both ends; fits flat underneath the base between the back ends of the two 32 in side sub-base rails, creating a 1-1/2 in exterior ledge and a 1/2 in interior ledge.
DSub-base side railx21 1/2" (T) × 3 1/2" (W) × 32" (L)90° crosscut both ends; attached flat underneath the left and right sides of the base, flush at the front and overhanging 1-1/2 in at the sides and back. Drill two 7/8 in rope holes through the overhang (4 in from front and 6-1/2 in from back).
EBack corner postx41 1/2" (T) × 3 1/2" (W) × 16" (H)90° crosscut both ends; two posts join in an L-shape on the sub-base ledge at each back corner.
FSub-base front railx11 1/2" (T) × 2 1/2" (W) × 51" (L)90° crosscut both ends; centered flat underneath the front base rail flush with the front face, leaving 1-3/4 in at each end for the side sub-base rails.
GVertical rail supportx91 1/2" (T) × 2 1/2" (W) × 16" (H)90° crosscut both ends; 2 mounted along each side ledge (front and middle) and 5 spaced ~7-1/2 in apart along the back ledge aligned with the interior slats.
HBack top railx11 1/2" (T) × 2 1/2" (W) × 58 1/2" (L)45° miter at both ends (long point to long point) so the inside corners intersect the back corner posts and meet the mitered armrests.
IArmrestx21 1/2" (T) × 2 1/2" (W) × 33" (L)45° miter on the back end only (opposing hands for left and right sides) and 90° crosscut on the front end; drill two 7/8 in rope holes (4 in from front and 6-1/2 in from back).
JFront fascia trimx13/4" (T) × 3 1/2" (W) × 58" (L)90° crosscut; scribed in place across the front face of the assembled swing and cut flush with the outer edges to cover exposed screw heads.

What to buy

Cut diagram
Cut diagram

Before you start

Lumber Selection

Layout and Labeling

Step by step

Step 1: Measure and Cut the Boards

Cut 2x4 and 2x3 frame boards to length with square ends or 45-degree miters.

Watch this step (3:12)

Guiding circular saw with speed square
Guiding circular saw with speed square

Parts in this step: (A) Base front and back rail, (B) Base end rail and interior slat, (C) Sub-base back rail, (D) Sub-base side rail, (E) Back corner post, (F) Sub-base front rail, (G) Vertical rail support, (H) Back top rail, (I) Armrest, (J) Front fascia trim

You'll need: Speed square, Circular saw, Miter saw, Tape measure, Pencil, 2x4 boards, 2x3 boards, 1x4 board

  1. 1.1 Stage lumber and mark cut lines
    • Mark 2x4s for base rails (A, C, D), slats (B), and corner posts (E).
    • Mark 2x3s for rail (F), supports (G), top rail (H), and armrests (I).
    • Draw square cut lines across boards with a tape measure and speed square.
    • Leave 1x4 front fascia trim (J) uncut for scribing in Step 5.
  2. 1.2 Make the 90-degree crosscuts
    • Lay marked 2x4 and 2x3 boards flat on rigid foam insulation sheets.
    • Hold the speed square on the board edge to guide the circular saw shoe.
    • Crosscut 90-degree parts: rails (A, C, D, F), slats (B), posts (E), and supports (G).
    • Check each piece off the cut list as you cut.
  3. 1.3 Cut the 45-degree miters on the top rails
    • Set a miter saw to 45 degrees or guide the circular saw along the speed square.
    • Cut 45-degree miters on both ends of 58-1/2 in back top rail (H).
    • Cut a 45-degree miter on the back end only of each 33 in armrest (I).
    • Cut the front end of each armrest (I) square at 90 degrees as a left-and-right pair.

Key measurements

  • Base front and back rails (A): two 54-1/2 in 2x4 boards
  • Base end rails and interior slats (B): seven 27-1/2 in 2x4 boards
  • Sub-base rails (C, D, F): one 51 in 2x4, two 32 in 2x4s, one 51 in 2x3
  • Vertical posts and supports (E, G): four 2x4s, nine 2x3s cut to 16 in
  • Mitered top rails (H, I): one 58-1/2 in 2x3 back rail, two 33 in 2x3 armrests
  • Tip: Rest boards on foam insulation sheets so the circular saw blade cuts cleanly without hitting the bench.
  • Tip: Only four cuts are 45-degree angles; all others are 90 degrees.
  • Heads up: Wear safety glasses when using the circular saw or miter saw.

Before you move on: Check the two 33 in armrests (I) have opposing 45-degree miters for a left-right pair.

Step 2: Assemble the Swing Base

Fasten the outer 2x4 mattress frame and five flat interior slats.

Watch this step (6:01)

Parts in this step: (A) Base front and back rail, (B) Base end rail and interior slat

You'll need: Drill driver, Impact driver, Drill bit, Tape measure, Pencil, 2x4 boards, Exterior wood screws

  1. 2.1 Assemble the outer base box
    • Stand the two 54-1/2 in base front and back rails (A) on 1-1/2 in edges.
    • Set two 27-1/2 in base end rails (B) on edge between rails (A) ends.
    • Flush all four boards top and bottom for a 3-1/2 in tall box.
    • Pre-drill two 5/32 in pilot holes and drive two 3 in screws per corner.
  2. 2.2 Space and secure the interior base slats
    • Lay the five remaining 27-1/2 in interior slats (B) flat inside, 6-1/4 in apart.
    • Flush each flat slat bottom with the bottom edge of rails (A).
    • Stand the frame on edge; trace a scrap 2x4 on the outer rail over each slat.
    • Pre-drill two centered pilot holes per slat end, drive 3 in screws, flip and repeat.
Step 2, part by part
Step 2, part by part
Assembled swing base frame
Assembled swing base frame

Key measurements

  • Interior slat spacing: 6-1/4 in between 27-1/2 in slats (B).
  • Mattress recess depth: 2 in lip above flat interior slats.
  • Pilot hole bit size: 5/32 in twist drill bit for 3 in wood screws
  • Tip: Trace a scrap 2x4 on the outer rail to center screws in the slat edge.
  • Tip: Stand the base on its side to drill and drive screws straight down.
  • Heads up: Do not drive screws near 2x4 slat edges without marking the slat outline first.

Before you move on: Check all five slats sit flush with the box bottom, leaving a 2 in top lip.

Step 3: Attach the Sub-Base Support Frame

Screw the sub-base frame under the base box for an exterior ledge and interior slat support.

Watch this step (7:07)

Base box on sub-base
Base box on sub-base

Parts in this step: (C) Sub-base back rail, (D) Sub-base side rail, (F) Sub-base front rail

You'll need: Drill driver, Impact driver, Drill bit, Tape measure, Pencil, 2x4 boards, 2x3 boards, Exterior wood screws

  1. 3.1 Attach the centered 51-inch front 2x3
    • Flip the base box upside down, flat slats facing up.
    • Center the 51 in sub-base front rail (F) flat on front base rail (A).
    • Flush the front of rail (F) with rail (A), leaving 1-3/4 in per end.
    • Pre-drill 3/4 in from the front face and drive 3 in screws into rail (A).
  2. 3.2 Attach the two 32-inch side 2x4s
    • Lay a 32 in sub-base side rail (D) flat on each side, tight to rail (F) ends.
    • Flush the front ends, leaving about a 1-3/4 in overhang outside each side and 1-1/2 in past the back.
    • Prop a 16 in board under the side overhang to hold rail (D) flat while drilling.
    • Pre-drill and drive 3 in screws into the base end rail, avoiding corner screws.
  3. 3.3 Mark and attach the 51-inch back 2x4
    • Fit the 51 in sub-base back rail (C) flat between the two side rails (D) rear ends.
    • Overhang rail (C) past back rail (A) by 1-1/2 in outside and 1/2 in inside.
    • Hold a scrap 2x4 inside the base rail below to mark the screw line.
    • Pre-drill the marked centerline and fasten rail (C) with 3 in exterior screws.
Step 3, part by part
Step 3, part by part
Sub-base frame under base box
Sub-base frame under base box
Sub-base overhangs and setbacks
Sub-base overhangs and setbacks

Key measurements

  • Front rail end gap: 1-3/4 in per end of 51 in front rail (F).
  • Exterior sub-base ledge: about 1-3/4 in on the left and right, 1-1/2 in at the back.
  • Interior sub-base lip: 1/2 in overhang under slats to distribute weight.
  • Tip: Prop one 16 in board under the side overhang as a flat support block while drilling.
  • Tip: Transfer the hidden base rail edges onto the back sub-base board top with a spare 2x4.
  • Heads up: Watch existing screw heads on the base side so you do not drill into metal.

Before you move on: Check the front sub-base rail sits flush, the sides overhang about 1-3/4 in and the back 1-1/2 in.

Step 4: Install the Vertical Rail Supports

Fasten four L-shaped corner posts and nine vertical rail supports around the sub-base ledge.

Watch this step (9:01)

Corner posts and rail supports
Corner posts and rail supports

Parts in this step: (E) Back corner post, (G) Vertical rail support

You'll need: Drill driver, Impact driver, Drill bit, Tape measure, Pencil, 2x4 boards, 2x3 boards, Exterior wood screws

  1. 4.1 Flip base right-side up and inspect ledge
    • Flip the base right-side up, sub-base flat on the floor.
    • Check the exterior ledge on the left, right, and back (about 1-3/4 in at the sides, 1-1/2 in at the back).
    • Check the interior sub-base overhang sits under mattress slats (B).
  2. 4.2 Attach the back corner 2x4 posts and side 2x3 supports
    • Set one 16 in back corner post (E) flush on each rear ledge corner.
    • Butt a second post (E) against the first's front in an L-shape.
    • Drive two 3 in screws at each base and two joining the posts.
    • Mount two 16 in vertical rail supports (G) per side: front-flush and centered.
  3. 4.3 Attach the five back 2x3 vertical rail supports
    • Align five 16 in supports (G) with slats (B) along the back ledge.
    • Pre-drill the top base hole; drive one 3 in screw to lock alignment.
    • Pre-drill below the first hole and drive a second 3 in screw.
Step 4, part by part
Step 4, part by part
Corner posts and vertical rail supports
Corner posts and vertical rail supports

Key measurements

  • Vertical rail support height: 16 in for four 2x4 posts (E) and nine 2x3 supports (G).
  • Back vertical support spacing: about 7-1/2 in, aligned with interior slats.
  • Tip: Pre-drill and drive each back support's top base screw first so it stays vertical for the second.
  • Tip: Align the five back supports and five interior slats for even spacing.
  • Heads up: Keep the upper screw joining the corner posts (E) down from the top end so top rail screws do not hit it.

Before you move on: Check all 13 vertical posts and supports stand plumb and flush at 16 in.

Step 5: Attach the Top Rails, Armrests, and Front Trim

Mitered back rail and armrests cap the vertical supports; 1x4 fascia covers the front screws.

Watch this step (12:00)

Parts in this step: (H) Back top rail, (I) Armrest, (J) Front fascia trim

You'll need: Speed square, Circular saw, Drill driver, Impact driver, Drill bit, Pencil, 2x3 boards, 1x4 board, Exterior wood screws

  1. 5.1 Attach the mitered 58-1/2 inch back top rail
    • Set the 58-1/2 in back top rail (H) flat on the rear supports.
    • Align each miter's inside corner with the back post (E) inside corner.
    • Drive two 3 in screws per corner post and one per back support.
  2. 5.2 Attach the left and right 33-inch armrests
    • Set 33 in armrests (I) flat on the side supports and corner posts.
    • Flush the rear miter against rail (H) and flush the front end.
    • Drive two 3 in screws at the rear corner, one per side support.
  3. 5.3 Measure, cut, and install the 1x4 front trim
    • Tip the swing on its back; lay the 1x4 front fascia trim (J) across the front.
    • Set one end side-flush and mark the other end flush.
    • Cut trim (J) square with a speed square and circular saw.
    • Pre-drill and screw trim (J) across the front with 3 in exterior screws.
Step 5, part by part
Step 5, part by part
Top rails, armrests, and front fascia
Top rails, armrests, and front fascia

Key measurements

  • Back top rail length: 58-1/2 in, mitered 45 degrees both ends.
  • Armrest length: 33 in, mitered 45 degrees at the rear.
  • Front fascia trim length: about 58 in, scribed flush across the front.
  • Tip: Overhang the outer edge of top rail (H) slightly so the 45-degree miter meets the corner post cleanly.
  • Tip: Mark the 1x4 front trim against the swing before cutting for a flush fit.

Before you move on: Check both rear 45-degree miters close tight and the 1x4 front trim covers all front screw heads.

Step 6: Drill Rope Holes, Fill, and Paint

Bore eight 7/8-inch rope holes through the armrests and sub-base, then fill, sand, and paint the frame.

Watch this step (13:32)

Painted frame with rope holes
Painted frame with rope holes

Parts in this step: (D) Sub-base side rail, (I) Armrest

You'll need: Drill driver, Forstner bit, Tape measure, Sanding sponge, Pencil, Paintbrush, Exterior wood filler, Exterior paint or stain

  1. 6.1 Bore 7/8-inch rope holes through armrests and sub-base
    • Mark armrests (I) 4 in from front and 6-1/2 in from back.
    • Mark sub-base side rails (D) directly below the armrest marks.
    • Set a scrap board under each sub-base side rail (D) to prevent exit tear-out.
    • Bore straight through the eight marks with a drill and 7/8 in Forstner bit.
  2. 6.2 Fill screw holes, sand, and apply exterior finish
    • Fill exposed screw holes and seams with exterior wood filler.
    • Sand dry wood filler smooth with a sanding sponge.
    • Coat the frame in exterior paint or stain with a paintbrush.
Armrest and sub-base rope holes
Armrest and sub-base rope holes

Key measurements

  • Rope hole diameter: 7/8 in bored with a Forstner bit
  • Front rope hole inset: 4 in back from armrest and sub-base front edges
  • Rear rope hole inset: 6-1/2 in forward from armrest and sub-base back edges
  • Tip: Back the sub-base ledge bottom with a scrap board when drilling with the Forstner bit to protect the floor.
  • Heads up: Wear safety glasses when boring 7/8 in rope holes and sanding wood filler.

Before you move on: Before hanging, check all eight 7/8 in holes are clean through-holes and the exterior paint is dry.

Step 7: Mount Eye Screws and Hang the Swing

Four heavy-duty eye screws in the ceiling joists hang the swing level on Manila ropes.

Watch this step (14:01)

Finished porch swing hung with rope
Finished porch swing hung with rope

Parts in this step: (B) Base end rail and interior slat, (D) Sub-base side rail, (I) Armrest

You'll need: Drill driver, Drill bit, Stud finder, Adjustable wrench, Pencil, Crib mattress and cover, Heavy-duty eye screws, Heavy-duty S-hooks, Manila rope

  1. 7.1 Locate ceiling joists and install four heavy-duty eye screws
    • Find and mark the ceiling joist centers for the four hanging points.
    • Pre-drill pilot holes straight up into the marked joist centers.
    • Thread 3/8 in x 4-7/8 in heavy-duty eye screws into the pilot holes.
    • Turn each screw fully home with an adjustable wrench through the eye loop.
  2. 7.2 Thread the Manila rope under the swing and hang from S-hooks
    • Cut the 50 ft Manila rope into two 25 ft lengths.
    • Run one rope down the front-left holes, under slats (B), up the front-right.
    • Run the second rope down the back-left, under the slats, up the back-right.
    • Knot all four ends to S-hooks, level the swing, and put the mattress inside.
Hanging points and rope routing
Hanging points and rope routing

Key measurements

  • Eye screw specs: 3/8 in x 4-7/8 in, rated 325 lb per screw in solid joists
  • Rope lengths: two 25 ft pieces cut from a 50 ft roll of 3/4 in Manila rope
  • Tip: Run each rope continuously under the swing slats from left to right for easy leveling.
  • Tip: Tie the two parallel ropes together at the center under the slats to prevent spreading.
  • Heads up: Anchor all four eye screws into structural ceiling joist centers before sitting on the swing.

Before you move on: Verify all four eye screws are fully threaded into solid joists and the swing hangs level before use.

Finishing

Filling and Sanding

Exterior Finish

Alternatives

These Specs are built from EmyLuDesigns's video “Crib Mattress Porch Swing”. Open the Crib Mattress Porch Swing project page.

Loading…