Spetz Specs No. 7526: step-by-step build guide

Framed Drop-Down Tray Ceiling

The complete step-by-step guide made from Indy Farm Life's YouTube video, free on Spetz. For the video, a step-by-step player and answers to your questions, see the Framed Drop-Down Tray Ceiling project page.

Framed Drop-Down Tray Ceiling

5 steps, 8 parts, 4 tools, 3 materials

Overview

Finished size: 24 in wide x 12 in drop around room perimeter

What you're building

Why this design works

What it takes

What decides success

Overall dimensions
Overall dimensions

Health and safety

Table and Circular Saw Safety

Ladders and Overhead Framing

Structural and Fire Code Safety

Protective Equipment and Handling

Tools

Materials

Hardware

HardwareSizeCountUsed in steps
Construction screws1, 2, 3, 4, 5

Cut list

PartNameQtySizeNotes
AWall fire-blocking stripx81/2" (T) × 12" (W) × 96" (L)Rip 1/2-in OSB sheets into 12-in wide strips and cut to length to span all four walls at the top of the wall studs.
BCeiling fire-blocking stripx81/2" (T) × 23" (W) × 96" (L)Rip 1/2-in OSB sheets into 23-in wide strips and fasten to the ceiling joists around the room perimeter, butting the back edge tight against the 1/2-in wall OSB.
CSoffit frame top and bottom platex81 1/2" (T) × 3 1/2" (W) × 168" (L)Used in pairs (inner and outer plate) to assemble manageable 12-ft or 14-ft horizontal ladder frames on the floor before lifting into place.
DSoffit frame cross studx441 1/2" (T) × 3 1/2" (W) × 20" (L)Sandwiched between the two 1-1/2-in thick 2x4 plates at 16 inches on center (plus corner blocks) for a total ladder frame width of 23 inches (3 in + 20 in = 23 in). Total count varies by room perimeter.
ECeiling ledger stripx41 1/2" (T) × 3 1/2" (W) × 144" (L)Fastened flat along the outer perimeter edge of the 23-in ceiling OSB across all four sides of the room to provide a nailing flange for the outer vertical OSB face.
FOuter vertical soffit face stripx81/2" (T) × 12" (W) × 96" (L)Rip 1/2-in OSB sheets into 12-in wide strips and screw vertically to the outer edge of the ceiling 2x4 ledger and the front edge of the 23-in soffit frame, bringing the total box width to 24 inches (1/2 in + 23 in + 1/2 in).
GCorner plate filler blockx81 1/2" (T) × 3 1/2" (W) × 24" (L)Cut to fit in place overhead to complete the inner and outer frame plates at the room corners where the pre-built 12-ft or 14-ft ladder frames stop short.
HCeiling joist blockingx161 1/2" (T) × 3 1/2" (W) × 14 1/2" (L)Cut to fit perpendicular between ceiling joists on the two walls running parallel to the joists to provide solid fastening points for the ceiling OSB and 2x4 ledger.

What to buy

Cut diagram
Cut diagram

Before you start

Lumber and sheathing

Layout and labeling

Step by step

Step 1: Install Wall and Ceiling Fire Blocking

1/2-inch OSB fire blocking rings the upper walls and ceiling joists.

Watch this step (2:42)

Wall and ceiling OSB fire blocking
Wall and ceiling OSB fire blocking

Parts in this step: (A) Wall fire-blocking strip, (B) Ceiling fire-blocking strip

You'll need: Table saw, Circular saw, Cordless drill or impact driver, Step ladder, 1/2-inch OSB sheathing, Construction screws

  1. 1.1 Fasten 12-inch OSB strips around the upper wall perimeter
    • Rip 1/2 in OSB into 12 in wall fire-blocking strips (A) (lengths and quantities estimated).
    • Hold each strip horizontally on wall studs, flush with ceiling joists.
    • Drive construction screws through the OSB into every wall stud.
    • Butt strip ends tightly over a stud to seal the wall cavity.
  2. 1.2 Attach 23-inch OSB strips to the ceiling joists
    • Along the two joist-parallel walls, install Step 5's joist blocking first.
    • Rip 1/2 in OSB into 23 in ceiling fire-blocking strips (B) (lengths and quantities estimated).
    • Push each strip's back edge tight against the 1/2 in wall OSB.
    • Drive construction screws up through the OSB into ceiling joists and blocking.
Step 1, part by part
Step 1, part by part
Installed wall and ceiling fire blocking
Installed wall and ceiling fire blocking

Key measurements

  • Wall fire-blocking strip width: 12 in down from ceiling joists
  • Ceiling fire-blocking strip width: 23 in out from the wall strip face
  • Ceiling projection so far: 23-1/2 in from bare wall studs
  • Tip: Rip OSB sheets on a table saw, not a circular saw, for straight edges.
  • Tip: Skip the wall and ceiling OSB strips over finished drywall, which already fire-blocks.
  • Tip: If preferred, fire-block with scrap 1/2 in or 5/8 in drywall instead of 1/2 in OSB.
  • Heads up: Check local fire-blocking material and sealing codes so wall or wire fires cannot reach the attic.

Before you move on: Check the 23 in ceiling OSB butts tight to the 12 in wall OSB all around without gaps.

Step 2: Build the 2x4 Soffit Frames

Assemble manageable 23-inch wide 2x4 ladder frames flat on the floor.

Watch this step (3:51)

Parts in this step: (C) Soffit frame top and bottom plate, (D) Soffit frame cross stud

You'll need: Circular saw, Cordless drill or impact driver, 2x4 framing lumber, Construction screws

  1. 2.1 Cut and assemble 23-inch wide 2x4 ladder frames on the floor
    • Cut 12 ft or 14 ft 2x4s for soffit frame top and bottom plates (C) (lengths and counts estimated).
    • Cut 2x4 soffit frame cross studs (D) to 20 in (44 count estimated).
    • Lay plate pairs on edge on the floor with 20 in cross studs 16 in on center.
    • Drive construction screws through both outer plate faces into every cross stud end.
Step 2, part by part
Step 2, part by part
Completed 23-inch wide soffit ladder frame
Completed 23-inch wide soffit ladder frame

Key measurements

  • Cross stud length: 20 in between both 1-1/2 in 2x4 plates
  • Cross stud spacing: 16 in on center along plates
  • Ladder frame width: 23 in outside-to-outside across plates and cross studs
  • Tip: Build 12 ft or 14 ft sections on the floor instead of one heavy full-wall piece.

Before you move on: Measure across the outer frame faces to check the 23 in width.

Step 3: Install the Ceiling Ledger and Outer OSB Face

Hang the 2x4 ceiling ledger and 12-inch outer vertical OSB face from the outer ceiling OSB edge.

Watch this step (4:34)

Ledger and outer OSB face
Ledger and outer OSB face

Parts in this step: (E) Ceiling ledger strip, (F) Outer vertical soffit face strip

You'll need: Table saw, Circular saw, Cordless drill or impact driver, Step ladder, 2x4 framing lumber, 1/2-inch OSB sheathing, Construction screws

  1. 3.1 Screw a 2x4 ledger along the outer edge of the ceiling OSB
    • Cut 2x4 ceiling ledger strips (E) (144 in length and count estimated).
    • Set each 2x4 flat under the 23 in ceiling OSB, flush with its outer edge.
    • Drive construction screws up through the 2x4 ledger and ceiling OSB into the joists and blocking.
  2. 3.2 Attach the 12-inch outer OSB face to the ceiling ledger
    • Rip 1/2 in OSB into 12 in outer vertical soffit face strips (F) (lengths and counts estimated).
    • Hold each strip vertically against the outer edge of 2x4 ceiling ledger strip (E).
    • Press the top flush to the ceiling; drive construction screws through the OSB into the ledger edge.
    • Leave the bottom edge free so 2x4 soffit frames tuck behind it in Step 4.
Step 3, part by part
Step 3, part by part

Key measurements

  • Outer vertical OSB face width: 12 in hanging from the ceiling
  • Total soffit box width: 24 in (1/2 in wall OSB, 23 in frame, 1/2 in outer OSB face)
  • Tip: Hang the outer 12 in OSB strip before the 2x4 frames as a front alignment flange.

Before you move on: Check the 2x4 ledger is flush with the 23 in ceiling OSB outer edge and the outer 12 in OSB strip is screwed along its top.

Step 4: Hang the Soffit Frames and Frame the Corners

Hang and fasten 2x4 soffit frames and corner filler blocks at the bottom of the 12-inch drop.

Watch this step (5:44)

Hung soffit frame and framed corner
Hung soffit frame and framed corner

Parts in this step: (C) Soffit frame top and bottom plate, (D) Soffit frame cross stud, (F) Outer vertical soffit face strip, (G) Corner plate filler block

You'll need: Circular saw, Cordless drill or impact driver, Step ladder, 2x4 framing lumber, Construction screws

  1. 4.1 Drive temporary support screws into the wall studs
    • Find the bottom of the perimeter 12 in wall OSB strip.
    • Drive construction screws partway into every couple of wall studs right under the wall OSB.
    • Leave screw heads sticking out so the soffit frame back rests on them.
  2. 4.2 Lift the soffit frames and screw them into place
    • With a helper, lift a pre-built 2x4 ladder frame of plates (C) and cross studs (D).
    • Rest the back plate on the wall screws and pull outer vertical soffit face strip (F) out slightly.
    • Tuck the front plate behind the outer OSB face strip, flush with its bottom.
    • Drive construction screws through the outer OSB face into the front plate to hold the front.
    • Drive construction screws through the back plate and wall OSB into the wall studs.
  3. 4.3 Piece in 2x4 blocking at the room corners
    • Measure the corner spans left by the 12 ft or 14 ft ladder frames.
    • Cut 2x4 corner plate filler blocks (G) and 20 in cross studs (D) (24 in filler length estimated).
    • Piece the plates and 20 in cross blocks into the corners overhead, flush with the frames.
    • Drive construction screws through the outer OSB face, corner plates, and cross studs into wall studs.
Step 4, part by part
Step 4, part by part
Hung soffit frames and room corners
Hung soffit frames and room corners

Key measurements

  • Soffit drop height: 12 in from main ceiling to frame underside
  • Clearance height under soffit: 9 ft under a 10 ft ceiling
  • Tip: Frame the entire soffit piecemeal in place overhead if working solo without a helper.
  • Tip: Route speaker wire or low-voltage lighting cables through the soffit before hanging drywall.
  • Heads up: Have a helper on a second ladder lift and pin 12 ft to 14 ft 2x4 ladder frames overhead.

Before you move on: Check the 2x4 soffit frame and corner block undersides sit level and flush with the wall OSB and outer OSB face bottom edges.

Step 5: Install Joist Blocking for Parallel Runs

Perpendicular 2x4 blocking sits between ceiling joists on the two room sides parallel to the joists.

Watch this step (6:52)

Perpendicular blocking between ceiling joists
Perpendicular blocking between ceiling joists

Parts in this step: (H) Ceiling joist blocking

You'll need: Circular saw, Cordless drill or impact driver, Step ladder, 2x4 framing lumber, Construction screws

  1. 5.1 Add perpendicular 2x4 blocking between parallel ceiling joists
    • Finish this before installing the ceiling OSB in Step 1.2 and ledger in Step 3.1 on the parallel walls.
    • Cut 2x4 ceiling joist blocking (H) to fit between the ceiling joists; the 14-1/2 in length and count are estimated.
    • Set blocks perpendicular between the ceiling joists along the 23 in soffit path.
    • Drive construction screws through the blocking into the joists for solid wood backing behind the ceiling OSB and ledger.
Step 5, part by part
Step 5, part by part
Ceiling joist blocking above soffit
Ceiling joist blocking above soffit

Key measurements

  • Ceiling joist blocking length: 14-1/2 in estimated, perpendicular between parallel joists
  • Tip: Place each block so both the 23 in ceiling OSB and inner 2x4 ceiling ledger screw into solid wood.
  • Heads up: Do not hang parallel soffit runs without perpendicular joist blocking first, or ceiling screws will miss solid framing.

Before you move on: Check each piece of joist blocking sits tight and flush with the ceiling joist bottoms.

Finishing

Drywall and trim

Cladding alternatives

These Specs are built from Indy Farm Life's video “Framed Drop-Down Tray Ceiling”. Open the Framed Drop-Down Tray Ceiling project page.