Porcelain Tile Driveway, Pathway, and Circular Lawn Border with Greek Key Entrance
Step-by-step guide made from Tidybricks patio restore's YouTube video.
Excavate an existing block-paved driveway and garden to install a heavy-duty reinforced concrete base and outdoor porcelain paving. The finished build features multi-directional drainage falls to slot drains, a double-bordered side pathway, a radial circular lawn border, a high-grip ribbed doorway ramp, and a custom Greek key mosaic entrance inlay.
The full step-by-step Spetz Specs for this project (every part, size, diagram and step, free): Porcelain Tile Driveway, Pathway, and Circular Lawn Border with Greek Key Entrance Spetz Specs.
- Difficulty: advanced
- Finished size: 1.2 m side pathway width; 400-500 mm total driveway depth (200-250 mm hardcore sub-base, 150-200 mm reinforced concrete slab)
Safety
- Wear hearing and eye protection when operating a wet bridge saw, angle grinder, or plate compactor.
- Use a cushioned kneeling mat when laying tiles and scrubbing grout residue to prevent knee injuries.
- Wear protective gloves when handling wet cement mortar, slurry primer, and acidic cement residue remover.
Must know before you build
- Cure the reinforced concrete slab for 6 weeks before starting to lay porcelain tiles.
- Cut porcelain face-up on the wet saw; cutting upside down chips the finished glaze.
- Roll slurry primer onto the underside of every slab; porcelain cannot bond to mortar alone.
- Pre-assemble intricate inlays dry on a DPM-lined template board before bedding into mortar.
- Secure narrow border cuts with rotary leveling clips to prevent shifting in the wet mortar bed.
Tools
- Mini Excavator (tracked micro digger, JCB, 8008 CTS)
- Power Barrow / Mini Dumper (4-wheel drive pedestrian dumper, Belle)
- Plate Compactor (Wacker Plate) (petrol vibrating plate compactor, Belle, PCX 13/40)
- String Line (mason's string line)
- Tape Measure (retractable pocket tape measure)
- Cordless Drill (cordless drill/driver, Makita)
- Angle Grinder (corded angle grinder with diamond blade, Makita)
- Hand Saw (woodworking hand saw)
- Garden Hose (water hose with spray nozzle)
- Concrete Rake / Screed (long-handled concrete placer and leveler)
- Wet Bridge Tile Saw (electric overhead rail wet tile cutter with side roller table and angle jig, Raimondi, Zoe 130, 110V)
- G-Clamp (screw clamp) (optional)
- Mini Paint Roller (short-handled roller)
- Bricklaying Trowel (pointing / bricklayer's trowel)
- Rubber Mallet (non-marking mallet)
- Spirit Levels (box-beam spirit levels and boat level, Stabila)
- Wheelbarrow (builder's wheelbarrow)
- Cement Mixer (portable electric drum mixer, Belle)
- Kneeling Pad (cushioned kneeling mat) (optional)
- Speed Square and Steel Rule (metal layout square and ruler)
- Pressure Washer (electric pressure washer, Mac Allister)
Materials
- MOT Type 1 Hardcore (crushed aggregate sub-base, Type 1, 200-250 mm depth)
- Line Marking Spray Paint (1 can, aerosol marking paint, red)
- Expansion Joint Strip (compressible foam expansion joint roll)
- Channel Drain (slot drain / channel drainage system, ACO)
- Steel Reinforcing Mesh (welded steel wire mesh sheets, A142)
- Bricks (spacer bricks, 75 mm height)
- Timber Shuttering Boards and Pegs (formwork timber)
- Ready-Mix Concrete (pumped ready-mix concrete, Tarmac, 150-200 mm (6-8 in) depth)
- Porcelain Paving Tiles (~135 sq m (127 sq m initial order + 1 extra pallet), outdoor vitrified porcelain paving slabs, Marshalls, Symphony series (Copper, Grey, Ivory) and Basalt, 80 x 80 x 2 cm, 60 x 60 x 2 cm, 40 x 80 x 2 cm)
- Paving Primer (cementitious slurry primer, Marshalls)
- Sharp Sand and Cement (mortar bedding mix, Travis Perkins, 4:1 sharp sand to cement ratio)
- Tile Leveling Clips and Caps (rotary screw cap and base clip leveling system, Tilers Tools)
- Tile Spacers (plastic cross spacers, 5 mm)
- Recessed Manhole Covers (infill tray inspection chamber covers)
- Damp Proof Membrane (DPM) (polythene sheet)
- Enclosure Posts (cylindrical screen posts, grey)
- Postcrete (fast-setting post concrete, Blue Circle)
- Sawn Versuro Edging Stones (sawn natural stone kerbs/edgings, Marshalls, Versuro)
- Exterior Jointing Grout (exterior paving jointing grout, Marshalls)
- KF Cement Residue Remover (3 bottles, acidic tile cleaner concentrate, Lithofin, KF)
- Artificial Grass (synthetic turf roll)
Step by step
Step 1: Excavate Driveway and Rear Garden
Break up the existing block paving and excavate the front driveway and rear garden lawn area using a mini excavator and grab lorry.
- Break Up Front Block Paving. Use the mini excavator bucket to pry up the existing interlocking brick pavers along the front hedge line to create a staging area for spoil.
- Excavate Rear Lawn into Power Barrow. Dig out the turf and topsoil from the rear garden lawn area to a depth of 6 inches and load it into a pedestrian power barrow to transport to the front driveway.
- Load Spoil with Grab Lorry and Continue Digging. Use a grab lorry to remove the first 26-ton stockpile of excavated earth and rubble from the front driveway while continuing to dig out the next section.
- Tip: Clear a section of the front driveway first to stockpile spoil brought around from the rear garden so the grab lorry can collect it all at once.
Step 2: Compact the Rear Garden Subgrade
Run a vibrating plate compactor over the excavated soil in the rear garden to firm up the subgrade before adding hardcore.
- Prepare Excavated Subgrade. Check that the rear lawn area is excavated to a 6-inch depth and position the vibrating plate compactor at the outer edge.
- Compact Bare Earth Subgrade. Guide the plate compactor in overlapping circular passes from the perimeter to the center to flatten and firm up the bare soil subgrade.
- Tip: A single pass with the plate compactor is sufficient when flattening bare earth prior to adding hardcore.
Step 3: Set Out Rear Alignment and Compact Hardcore
Set string lines aligned with the house window, spread a layer of MOT Type 1 hardcore over the rear garden area, and compact it with a plate compactor.
- Set Intersecting Center String Lines. Drive wooden pegs at the edges of the rear garden and stretch two perpendicular string lines across the area, aligning the main axis with the center of the rear house window.
- Tip: Align the center axis of a garden feature with the middle of the overlooking house window so it looks symmetrical from inside.
- Spread Reclaimed Hardcore in Rear Garden. Separate clean hardcore from the old front driveway bricks, transport it to the rear garden, and spread it in 2-inch layers over the compacted subgrade.
- Tip: Separate clean hardcore from under the old driveway and reuse it in the rear garden rather than paying to haul it away and buy new aggregate.
- Compact Hardcore Sub-Base. Run the vibrating plate compactor in spiral passes across the MOT Type 1 hardcore until the sub-base is tightly consolidated and level.
Step 4: Mark the Circular Lawn Area
Drive a center pin at the string intersection and use a non-binding string loop attached to a can of line-marking paint to scribe the circular lawn perimeter.
- Rig Non-Binding String Compass to Spray Can. Drive a steel pin at the center string intersection, tie a string line to a can of line-marking spray paint, and tie a plastic bottle-top ring to the other end to slip over the center pin.
- Tip: Switch an oval lawn design to a true circle so that all radial border tile cuts share the exact same wedge angle.
- Tip: Tie a plastic bottle-top ring to the center end of your radius string so it rotates freely around the center peg without coiling up and shortening the measurement.
- Spray Circular Perimeter Line. Place the bottle-top ring over the center pin, pull the string taut, and walk around the perimeter while spraying red line-marking paint onto the compacted hardcore.
Step 5: Excavate Front Driveway to Depth and Lay Sub-Base
Excavate the remaining front driveway to a 350 mm depth below finished level, remove the spoil, and spread and compact the MOT Type 1 hardcore sub-base.
- Excavate Driveway and Leave Temporary Access Path. Dig out the main front driveway area with the mini excavator while leaving a strip of existing block paving intact to serve as a temporary walkway to the front door until the next grab lorry arrives.
- Tip: Leave a strip of existing paving intact as a temporary walkway so the homeowners can get in and out of the house until the final grab lorry collection.
- Verify 350 mm Depth Below String Line. Spread and compact an initial 100 mm layer of hardcore, then measure from the compacted surface to the finished-level string line with a tape measure to confirm 350 mm of remaining depth.
- Remove Final Spoil and Deliver MOT Type 1 Hardcore. Deliver fresh MOT Type 1 hardcore with the grab lorry and load out the final pile of excavated spoil, totaling 48 tons removed.
Step 6: Install Formwork, Expansion Foam, and Reinforcing Mesh
Set timber shuttering boards and foam expansion strips along the driveway bays, then lay A142 steel reinforcing mesh elevated on 75 mm brick spacers.
- Set Timber Shuttering and Tie A142 Mesh on Brick Spacers. Stake timber shuttering boards along the expansion joint lines to divide the driveway into bays, then lay A142 steel reinforcing mesh sheets propped up on 75 mm bricks and tie the overlapping sheets together.
- Tip: Prop A142 steel mesh on 75 mm spacers so it sits in the center of a 150 mm concrete pour.
- Fit Perimeter Expansion Foam and Complete Mesh Layout. Line the house brickwork and bay dividers with compressible white expansion foam strips and complete laying the A142 steel mesh across the remaining driveway bays.
Step 7: Dampen Sub-Base and Pour Concrete Slab
Soak the hardcore sub-base with water to prevent rapid moisture loss, then pump, spread, and screed a 150-200 mm reinforced concrete slab across the driveway.
- Soak the Hardcore Sub-Base with Water. Spray water across the compacted hardcore sub-base and steel mesh with a garden hose until thoroughly dampened before the concrete pump begins.
- Tip: Drench the hardcore sub-base with a garden hose before pouring concrete so the dry ground does not suck moisture out of the concrete too quickly.
- Pump and Screed Upper Driveway Concrete Bay. Pump ready-mix concrete into the upper driveway bay over the A142 mesh, rake it level to the shuttering boards, and screed the surface to the planned drainage falls.
- Pump and Screed Lower Driveway Concrete Bay. Move the pump hose to the lower driveway bay, pour the concrete over the reinforcing mesh, and rake and tamp the surface to match the slope toward the corner drain.
Step 8: Cut Border Strips and Mitered Corners
Set up a wet bridge saw with a stop block and angle jig to rip porcelain slabs into border strips and cut repeatable 45-degree mitered corner pieces.
- Rip Porcelain Border Strips Using a Stop Block. Set a stop piece at the back of the wet bridge saw table, butt an 800 mm grey porcelain slab against it with the overhang supported on the side roller table, and pull the saw head across to rip uniform 300 mm border strips.
- Tip: Use a side roller table on the bridge saw to support oversized 800 mm slabs so the offcut does not tip and break at the end of the cut.
- Tip: Set a stop block on the back fence of the wet saw so you can slide each slab up to the stop for repeatable rip cuts.
- Dry-Fit Front Doorway Mat and Configure Miter Jig. Dry-lay the 400 x 800 mm basalt centerpiece and surrounding grey and ivory border strips outside the front door, thenbolt the adjustable 45-degree angle jig to the wet saw table to cut the mitered corners.
- Tip: Move the angle jig to the opposite side of the saw table to cut opposing 45-degree miters rather than flipping the tile upside down.
- Common mistake: Cutting porcelain tiles upside down on a wet saw, which causes the blade to chip the finished top surface.
- Batch-Cut 45-Degree Mitered Border Corners. Secure the border strip to the angle jig with a G-clamp and brick weight, slice the 45-degree miter on the wet bridge saw, and repeat for all 32 corner pieces while saving the triangular offcuts.
- Tip: Save the triangular offcuts from mitered border tiles to use in decorative entrance patterns later.
Step 9: Tile the Side Pathway and Front Entrance
Coat the back of each porcelain tile with slurry primer and bed them onto a 4:1 sharp sand and cement mortar mix along the side pathway using 5 mm spacers and leveling clips.
- Prime and Bed First Mitered Pathway Border Tile. Trowel a wet mortar bed two courses below the damp proof course (DPC), roll paving primer onto the underside of the first grey mitered border tile, and set it 10 mm off the house wall aligned with the string line.
- Tip: Always coat the back of porcelain slabs with slurry primer before placing them on the mortar bed so they bond properly.
- Tip: Set the outer border tile 10 mm off the house brickwork so irregularities in the wall do not throw off your straight tile line.
- Level Border Tile with 10 mm Cross-Fall. Tap the border tile with a rubber mallet and check with a spirit level along both axes, setting a 10 mm cross-fall away from the house wall for water runoff.
- Lay Pathway Center Slabs and Borders with Leveling Clips. Continue laying the 600 mm copper center tiles, narrow ivory strips, and 300 mm grey outer borders down the 1.2 m pathway and front entrance, inserting 5 mm cross spacers and rotary leveling clips at every joint.
- Tip: Use under-tile leveling clips on narrow ivory border strips to stop them from shifting or tipping relative to the larger slabs.
Step 10: Mark, Cut, and Dry-Fit Circular Border Tiles
Use a center pivot string line to mark radial wedge angles on the border tiles, cut the voussoir shapes on the wet saw, and dry-fit them around the circular lawn perimeter.
- Mark Radial Wedge Angles from Center Pin. Place a square border tile on the dry concrete foundation ring, pull a string line taut from the center pin to both outer corners of the tile, and mark the two converging radial lines with a Sharpie.
- Tip: Pour a concrete foundation ring first so you can dry-lay all the circular border tiles and adjust the joints before bedding them in mortar.
- Set Saw Jig and Cut Voussoir Wedge Tiles. Align the marked tile on the wet bridge saw, lock the angle jig to match the radial lines, and batch-cut the wedge-shaped voussoir tiles.
- Scribe Circle on Foundation Ring and Dry-Fit All Wedges. Use a two-string bridle tied to a screw and bottle-top pivot on the center pin to scribe the exact circle onto the concrete ring, then dry-lay all the wedge tiles around the perimeter and adjust the joint widths until the circle closes evenly without a small cut.
- Tip: Tie two string lines to the top and bottom of your scribing screw to form a triangle that holds the screw upright at a consistent radius.
Step 11: Bed and Level the Circular Lawn Border
Lift one dry-fitted wedge tile at a time, apply slurry primer, and bed the grey and ivory circular border courses onto mortar while checking levels.
- Lift, Prime, and Bed Grey Circular Border Wedges One by One. Lift a single dry-fitted grey wedge tile from the circle, trowel wet mortar onto the concrete ring, roll primer onto the back of the tile, and tap it down level with the adjacent patio and neighboring wedges.
- Tip: Lift and bed only one dry-fitted circular border tile at a time so you do not lose your pre-adjusted joint spacing.
- Check Level Closure Around the Full Circle. Lay a long spirit level across the final bedded wedge tile and the starting tile to verify they meet flush, tapping the last few tiles down a couple of millimeters to level out the closure.
- Trim and Fit Inner Ivory Border Veneers. Fit narrow ivory border strips along the inner circumference of the grey wedges, shaving 1 mm off any oversized pieces with an angle grinder or cutting each piece individually to keep the radial joints aligned.
- Tip: Cut or trim each inner ring border strip individually to match its corresponding outer wedge tile so the radial joints stay aligned.
Step 12: Lay the Upper Driveway Porcelain Tiles
Spread a wet mortar bed, roll slurry primer onto the porcelain slabs, and lay the upper driveway rows using 5 mm spacers and rotary leveling clips.
- Insert Leveling Clips and Prime Porcelain Slab. Trowel a full bed of 4:1 sharp sand and cement mortar onto the concrete slab, slide Tilers Tools leveling clip bases under the edges of the adjacent laid tiles, and roll a generous coat of slurry primer onto the back of the next porcelain slab.
- Tip: Leave leveling caps in place until the mortar cures so everyone on site can see which tiles are freshly laid and avoid stepping on them.
- Bed Slab, Lock Corner Clip, and Tap to String Line. Set the primed slab onto the mortar bed, spin on one leveling cap to anchor the back edge, insert 5 mm cross spacers, tap the outer corner inward and down to the string line with a rubber mallet, and tighten all remaining leveling caps.
- Tip: Tighten one leveling cap first to anchor the slab, then tap the outer corner inward with a rubber mallet to close the joints against the 5 mm spacers before tightening the remaining caps.
Step 13: True the Manhole Frame and Test Driveway Runoff
Straighten a warped recessed manhole frame using timber wedges and boiling water, then pour water across the tiled driveway to verify runoff toward the drain.
- Wedge Warped Manhole Frame Square and Pour Boiling Water. braced timber battens inside the bowed plastic recessed manhole frame to force the sides out to a uniform 5 mm joint against the surrounding porcelain tiles, then pour boiling water over the plastic to relax the warp.
- Tip: Straighten a bowed plastic recessed manhole frame by wedging it open to the correct width with timber battens and pouring boiling water over it.
- Inspect Upper Driveway Valley and Pour Water to Test Runoff. Review the intersecting slopes of the upper driveway and pour a bucket of water across the newly laid porcelain slabs to verify that surface water channels cleanly down the central valley toward the garage ACO drain.
- Tip: Pour a bucket of water over the laid slabs to test that multi-directional falls channel water toward the drain as planned.
Step 14: Rip Replacement Rectangular Tiles on the Bridge Saw
Cut full-size porcelain slabs down into narrower rectangular field tiles on the wet bridge saw to complete the random course pattern.
- Set Stop Jig on Bridge Saw and Rip Rectangular Slabs. Set the stop jig on the wet bridge saw table and rip full-size square porcelain slabs into narrower rectangular tiles to replace the depleted size in the random layout.
- Set String Lines for Remaining Driveway Courses. Stretch string lines across the lower driveway from the laid slabs to the perimeter border line to guide the level and fall of the next rows.
Step 15: Lay Lower Driveway Field Tiles
Prime and bed the remaining field tiles onto the mortar base, lock the corners with leveling clips, and tap them flush across the lower driveway.
- Place Leveling Clips and Prime Underside of Slab. Trowel out the 4:1 sharp sand and cement mortar bed, slide four leveling clip bases under the adjacent tile edges, brush Marshalls paving primer over the underside of the slab, and set it into position.
- Attach Caps, Insert Spacers, and Level Slab. Spin the red leveling caps loosely onto the clip posts, insert 5 mm cross spacers, tap the outer corner inward and down with a rubber mallet while checking flatness with a spirit level, and tighten the caps.
- Tip: Use a 4:1 sharp sand to cement mortar mix for bedding outdoor porcelain driveway slabs.
- Tip: Kick the leveling caps off the following day once the mortar has cured and save the caps for the next section.
Step 16: Install Slot Drains, Manhole Covers, and Border Corners
Install the ACO slot drains and recessed manhole trays, replace cross-jointed slabs with larger cut tiles, and bed the mitered perimeter border corners.
- Fit ACO Slot Drains, Corner Miters, and Recessed Manhole Cover. Bed the ACO slot drain channels along the house perimeter and side gate, fit the mitered grey and ivory border corners around the utility box and downpipe, and inlay porcelain slabs into the recessed manhole cover.
- Remove and Replace Cross-Jointed Slabs and Adjacent Half-Tiles. Cut out the cured slabs that formed an unwanted four-way cross joint next to the rear manhole cover, trim the misaligned edge at the slot drain transition, and lift out the two adjacent half-tiles on the side pathway to replace them with full staggered slabs.
- Tip: Avoid four-way cross joints and side-by-side half-tiles in linear paving courses by replacing them with a larger L-cut slab.
- Common mistake: Leaving accidental four-way cross joints or two half-tiles next to each other in a linear running bond.
- Bed Pre-Cut Mitered Perimeter Border Corners. Lay the pre-cut 45-degree mitered grey and ivory border corner pieces along the front hedge and flowerbed perimeter.
Step 17: Build and Tile the Textured Doorway Ramp
Construct the sloped mortar bed outside the side door and lay alternating raised grey and recessed copper porcelain strips to create a high-grip ramp.
- Form Ramp Base and Lay Mitered Border and Basalt Landing. Build up the sloped mortar bed inside the ramp retaining kerbs, lay the mitered grey and ivory perimeter border, and bed the flat basalt landing slab directly outside the door.
- Inlay Alternating Raised Grey and Recessed Copper Grip Strips. Bed alternating narrow strips of grey and copper porcelain across the ramp slope, setting the grey strips slightly proud of the copper strips to form a ribbed, slip-resistant tread, then lay the surrounding driveway field tiles.
- Tip: Set alternating porcelain strips slightly proud on a sloped ramp to create a ribbed, high-grip walking surface.
Step 18: Cut and Assemble the Greek Key Mosaic on a Template
Rip 50 mm porcelain strips, cut 45-degree miters on the bridge saw, and dry-assemble four Greek key pattern squares onto a marked MDF template board.
- Cut Diagonal Miter and Rip 50 mm Strips on Bridge Saw. Place a square porcelain slab diagonally on the wet bridge saw table, cut from corner to corner to create a 45-degree angle, and rip the resulting triangles into 50 mm wide strips with pre-mitered ends.
- Tip: Cut a square slab diagonally from corner to corner first, then rip 50 mm strips parallel to the factory edges so every strip already has a 45-degree miter on one end.
- Set Up MDF Template Board on Damp Proof Membrane. Lay scaffold planks and a polythene damp proof membrane (DPM) next to the driveway entrance and place the full-size drawn MDF Greek key template board on top.
- Tip: Place a plastic damp proof membrane under and over an MDF template board to prevent moisture from warping the template.
- Cut and Dry-Assemble the Four Greek Key Squares. Measure each segment directly off the template board using a speed square with a 5 mm recessed lip to mark 45-degree miters, cut the ivory, copper, and grey 50 mm strips on the wet saw, and dry-assemble all four interlocking Greek key squares on the template.
- Tip: Use a speed square with a 5 mm recessed lip that hooks into the tile joint to mark accurate 45-degree miter cuts directly on the template.
- Cut and Dry-Fit Perimeter Border Strips Around Template. Cut the 50 mm copper inner border strips and the surrounding ivory and grey border slabs, dry-fitting them around the four Greek key squares before cutting the final outer mitered corners.
- Tip: Leave the outer mitered border corners uncut until the central mosaic is bedded in place so you can measure the exact final dimensions.
Step 19: Bed and Level the Greek Key Entrance Feature
Transfer the Greek key mosaic pieces and surrounding border tiles onto a wet mortar bed at the driveway entrance, securing every joint with spacers and leveling clips.
- Bed First Greek Key Square with Spacers and Leveling Clips. Trowel a flat mortar bed at the driveway entrance, prime the back of each 50 mm strip from the first Greek key square, and bed them outward from the corner while inserting 5 mm spacers and rotary leveling clips at every joint.
- Bed Remaining Three Greek Key Squares. Transfer and bed the second, third, and fourth Greek key squares onto the mortar base, using a speed square to check squareness and tightening leveling caps across all joints.
- Tip: Loosen the rotary leveling caps slightly to slide small mosaic strips into exact miter alignment before re-tightening.
- Cut and Bed Mitered Border Frame Around Greek Key Inlay. Remove the cured leveling clips from the Greek key mosaic, measure and cut the 45-degree mitered grey and ivory border slabs to frame the inlay, and bed them flush with the pavement threshold.
Step 20: Install Bin Screen Posts and Driveway Stone Edgings
Set vertical enclosure posts in the rear garden using a timber alignment jig and Postcrete, then bed and haunch sawn stone edgings along the front driveway borders.
- Set Rear Bin Screen Posts Using a Trestle Jig and Postcrete. Clamp four long timber boards across two trestles to form a guide channel over the post trench, stand the cylindrical grey screen posts upright inside the jig with string line wrapped around them as spacers, and pour Postcrete and water into the trench.
- Tip: Use two trestles and four long boards as an alignment jig to hold vertical screen posts plumb while pouring Postcrete.
- Tip: Wrap string line around adjacent posts to maintain an even gap between them while the concrete sets, then cut the string off afterward.
- Bed and Haunch Sawn Stone Edgings Along Driveway Flowerbeds. Trowel a mortar bed along the driveway flowerbeds and hedge line, prime and tap Marshalls Sawn Versuro edging stones into place to retain the soil, haunch the backs with mortar, and taper the end stones down flush with the street pavement.
- Tip: Cut the end edging stone at a taper so it meets the street pavement flush and eliminates a trip hazard.
Step 21: Clean Grout Haze with Cement Residue Remover
Scrub the grouted porcelain driveway with cement residue remover and rinse thoroughly to remove surface grout haze.
- Scrub Tiles with Lithofin KF Cement Residue Remover and Rinse. Apply Lithofin KF Cement Residue Remover across the grouted porcelain tiles, scrub the surface on hands and knees with abrasive pads to dissolve the grout haze, and rinse clean with a pressure washer.
- Tip: Scrub grouted porcelain tiles with Lithofin KF Cement Residue Remover so they do not dry with a cloudy grout haze.
- Common mistake: Assuming grouted porcelain tiles are clean because they look clear while wet, leaving a cloudy cement residue once dry.