Complete the upper half of a traditional field dry stone boundary wall by building tightly between the through stones, leveling the top lift using string lines, and dressing and installing half-moon coping stones. The finished stretch forms a self-supporting 12-inch-wide topped stone wall.
The full step-by-step Spetz Specs for this project (every part, size, diagram and step, free): Dry Stone Field Boundary Wall: Through Stones, Top Lift, and Coping Stones Spetz Specs.
- Difficulty: intermediate
- Finished size: 4.5 m long, 12 in wide at top
Safety
- Always wear protective work gloves when handling rough field stone and swinging a masonry walling hammer.
- Work at a waist-high dressing table when shaping multiple coping stones to avoid back injury.
Must know before you build
- Sort stone by thickness: save thinner stones for the top lift, reserving chunky pieces below.
- Sneak extra 13–14" through stones into the top lift to reinforce bonding as the wall settles.
- Pack the center cavity solidly with small hearting stones; hollow gaps compromise stability.
- Dress half-moon coping stone bases to exactly 12 inches to match the wall's top width.
- Keep different weight hammers on hand to match the thickness and hardness of coping stones.
Tools
- Stone walling hammer (masonry pick / stone-dressing hammer, OX)
- Work gloves (protective grip work gloves)
- String lines and batter frames (masonry guide strings and wooden A-frame profiles)
- Wooden stone-dressing table (portable wooden workbench) (optional)
- Tape measure (retractable pocket tape measure)
Materials
- Through stones (bond stones) (flat spanning field stones)
- Walling face stones (natural dry-walling stones, thinner stones for the top lift)
- Filling stones (hearting) (small rubble / stone offcuts)
- Coping stones (copers) (approx. 30, flat stone slabs shaped into half-moon copers, 12 in bottom width, rounded half-moon top profile, 12 in wide along the base)
Step by step
Step 1: Build between the through stones
Lay face stones along the string lines and pack small filling stones into the center cavity to bond the course between the through stones.
- Fit and dress face stones between the through stones. Set flat-faced walling stones along both outer edges between the spanning through stones, keeping the outer faces aligned with the string lines. Use the walling hammer to knock off high spots so each stone sits flat and solid without rocking.
- Tip: Test-fit several stones and flip them to find the flattest bedding face before trimming with the hammer.
- Common mistake: Letting face stones push past the string line, which ruins the batter profile of the wall.
- Pack filling stones into the center cavity. Place smaller angular stones into the center channel between the two outer rows of face stones. Tap and wedge the hearting stones down with the walling hammer so they pin the tails of the face stones firmly.
- Tip: Tap hearting stones firmly into the gaps between face stone tails to lock the course together.
- Build the course up level with the through stones. Continue laying face stones along both string lines and filling the center until the entire section between the through stones reaches the same height as the through stones.
- Tip: Build tightly up against both sides of each through stone so the spanning stones are locked securely into the wall.
- Common mistake: Leaving voids around the through stones, which weakens the bond between the two sides of the wall.
Step 2: Lay extra through stones and level the top course
Place smaller through stones across the upper course, fill the center with hearting, and dress and lay thinner flat stones level with the top string lines.
- Place extra through stones and pack the upper cavity. Pack filling stones into the upper center cavity and lay smaller, flat through stones (~13–14 inches wide) across the full width of the wall between the two string lines. Wedge small stone shims underneath if needed to stop any wobble.
- Tip: Slide a thin stone shard underneath any corner of a through stone that rocks so it beds down solid.
- Dress and lay thinner stones level with the top string lines. Select thinner flat stones for the top course, trim their edges with the walling hammer, and set them along the top of the wall flush with the raised string lines to create a flat, 12-inch-wide bed for the coping stones.
- Tip: Use thinner flat stones on the final course to bring the top surface flush with the string lines.
- Common mistake: Leaving high or uneven stones on the top lift, which prevents the coping stones from sitting flat.
- Tip: Add a few smaller through stones (~13–14 inches wide) near the top lift to give the upper wall extra bond as it settles over time.
Step 3: Measure, dress, and set the coping stones
Measure a 12-inch base on each coping stone, mark and hammer the top into a rounded half-moon profile on the worktable, and set the copers along the top of the wall.
- Measure and mark the 12-inch coping stone width. Lay a flat stone slab on the wooden dressing table, measure 12 inches across the flat bottom edge with a tape measure, and scribe a mark on the stone to indicate where the excess needs to be dressed off.
- Tip: Scribe the 12-inch width mark directly onto the face of the stone with a sharp piece of stone or tool tip before hammering.
- Hammer the coping stone into a half-moon shape and set it on the wall. Use the stone walling hammer to chip away the excess width and round the top edge into a half-moon profile on the worktable. Carry the dressed coping stone over to the wall and set its 12-inch flat base upright against the previous coper.
- Tip: Knock off the bulk waste while the stone lies flat on the table, then stand it on edge to refine the rounded half-moon top.
- Watch out: Keep your supporting hand well back from the edge being struck while chipping stone on the table.
- Repeat measuring, dressing, and setting for the remaining coping stones. Measure, mark, and hammer approximately 30 coping stones to a 12-inch base and half-moon top profile, setting them tightly in a continuous upright row along the entire 4.5-meter stretch of leveled wall.
- Tip: Keep different weight hammers on your dressing table so you can match the hammer to the thickness and hardness of each stone.
- Common mistake: Cutting the base of the coping stone narrower or wider than the 12-inch top width of the wall.