Spetz Specs No. 5719: step-by-step surface & covering guide

DIY Polished Concrete Outdoor Countertop and Base

The complete step-by-step guide made from Tidybricks patio restore's YouTube video, free on Spetz. For the video, a step-by-step player and answers to your questions, see the DIY Polished Concrete Outdoor Countertop and Base project page.

DIY Polished Concrete Outdoor Countertop and Base

9 steps, 6 parts, 13 tools, 13 materials

Overview

Finished size: 1.67 m long countertop on a 900 mm high base

Surface & Covering

Why Do It Yourself

What It Takes

What Decides Success

Layout at a glance

Health and safety

Angle Grinders and Power Tools

Silica Dust and Respirators

Wet Cement and Chemical Finishes

Heavy Masonry, Mesh, and Formwork

The surface & its prep

Tools

Materials

Hardware

HardwareSizeCountUsed in steps
Masonry Screws2, 8

Finishes & supplies, in the order they go on

ProductWhat it doesMix & coatsDry timeApplied with
Grey PaintPre-coat tongue and groove cladding boards before fixing to the baseDry completely before cutting and fixing claddingPaintbrush
CementMix with building sand, water and washing-up liquid for block mortar and slab concreteA few drops of washing-up liquid per bucket; sand-to-cement ratio not stated in sources1 week cure before removing countertop formworkTrowel
Concrete Hardener & DustprooferPenetrate, harden and dustproof the ground concrete slab before and during fine polishingReady to use (5 L container), 2 coatsSoak overnight after initial grind; let top-up coat dry before final polishingPaintbrush
Paving SealWeatherproof the polished concrete and deepen the stone finishReady to use, 2 coatsApply second coat while first coat is tacky; 2 days for full curePaintbrush

Covering elements

PartNameQtySizeNotes
ATongue and groove claddingx1Pre-painted grey before installing horizontally across the battened blockwork base.
BInsulation board (Kingspan / Celotex )x1Placed atop the U-shaped block base to form the underside of the cast concrete countertop.
CTimber formwork stripscount yours1.67 m longSpaced off the blockwork by the batten and cladding thickness plus the concrete overhang.
DSteel reinforcement meshx11 piece · Embedded into the concrete countertop pour for structural reinforcement.
EWooden battensx7900 mm long4 on front, 3 on side · Cut to 900 mm and fixed vertically to the concrete block base with masonry screws.
FCorner piecescount yoursTrim pieces installed over the outside corners of the tongue and groove cladding.

Before you start

Protect & Clear

Cut & Paint Station

Tool Set-Up

Step by step

Step 1: Build the Blockwork Base

Level, plumb U-shaped concrete block base ready for the countertop mold.

Watch this step (2:24)

U-shaped concrete block base complete
U-shaped concrete block base complete

You'll need: Drill with Paddle Mixer, Mixing Bucket, Trowel, Spirit Level, Concrete Blocks, Cement, Building Sand, Washing-up Liquid

  1. 1.1 Mix the Mortar
    • Put building sand, cement, and water in the mixing bucket.
    • This guide does not state the mix ratio; general practice is 4:1 sand to cement.
    • Add a few drops of washing-up liquid as a mortar plasticizer.
    • Blend the batch to a workable consistency using the drill with paddle mixer.
  2. 1.2 Lay the Concrete Blocks
    • Lay concrete blocks in a U-shaped footprint shorter than the 1.67 m countertop, leaving room at each end for the batten, the cladding and the overhang.
    • Trowel mortar onto horizontal and vertical joints.
    • Check every course is plumb and level with the spirit level.

Key measurements

  • Countertop and formwork length: 1.67 m; build the block base shorter by batten + cladding + overhang at each end
  • Barbecue side clearance: about 150 mm of countertop each side of the grill
  • Tip: A few drops of washing-up liquid make mortar smoother and easier to spread.

Before you move on: Level the top block course both ways with the spirit level before formwork.

Step 2: Construct the Countertop Formwork

Insulation base and outer timber side forms clamped tight with even overhang.

Watch this step (3:08)

Insulation floor and clamped timber forms
Insulation floor and clamped timber forms

Parts in this step: (B) Insulation board (Kingspan / Celotex ), (C) Timber formwork strips

You'll need: Hammer Drill, Hammer, Clamps, Spirit Level, Insulation Board, Timber/Plywood, Masonry Screws

  1. 2.1 Create the Form Base
    • Cut insulation board (B) to fit the U-shaped block opening.
    • Set the board flush with the block tops as the mold floor.
  2. 2.2 Build and Attach the Side Forms
    • Pre-drill and screw a spacer strip of batten plus cladding thickness to the blocks.
    • Add a second spacer strip outside the first to set the concrete overhang.
    • Fix the 1.67 m timber formwork strips (C) against the outer spacer with clamps.
    • Unscrew the inner spacer strips so the formwork overhangs the future cladding.
    • Patch timber joint gaps so wet concrete cannot leak.

Key measurements

  • Formwork length: 1.67 m along the front face
  • Overhang offset: batten plus tongue and groove thickness plus desired slab overhang
  • Tip: Tap masonry screws in with a hammer before tightening the last threads.
  • Heads up: Unsealed gaps or weak clamps let shuttering give way under wet concrete weight.

Before you move on: Check inner spacer strips are unscrewed and formwork joints sealed tight.

Step 3: Pour and Level the Concrete Countertop

Formwork filled with reinforced, vibrated concrete screeded flat to the top edge.

Watch this step (6:10)

Concrete poured and screeded flush
Concrete poured and screeded flush

Parts in this step: (D) Steel reinforcement mesh

You'll need: Drill with Paddle Mixer, Mixing Bucket, Shovel, Hammer, Oscillating Multi-Tool, Trowel, Spirit Level, Cement, Building Sand, Washing-up Liquid, Steel Reinforcement Mesh

  1. 3.1 Mix and Pour Concrete
    • Mix building sand, cement, water and a few drops of washing-up liquid.
    • Shovel wet concrete into the formwork until the mold is half full.
  2. 3.2 Add Reinforcement and Vibrate
    • Lay steel reinforcement mesh (D) flat on the half-filled concrete.
    • Tap around the outer formwork with a hammer to release air bubbles.
    • Or press an oscillating multi-tool to the timber sides to vibrate the mix.
  3. 3.3 Top Off and Level the Concrete
    • Fill the formwork to the top rim with a final concrete skim.
    • Draw the spirit level across the forms to screed the surface flat.
    • Trowel the wet top smooth and cover if rain starts.

Key measurements

  • First concrete lift: 50% of formwork depth before placing steel mesh
  • Tip: Vibrating the outer formwork settles the mix and prevents edge air pockets.
  • Heads up: Omitting the steel reinforcement mesh lets the concrete slab crack over time.

Before you move on: Check the screeded surface is level and flush with the formwork top.

Step 4: Remove the Formwork (Demold)

Cured concrete slab stripped of its wooden mold with clean perimeter edges.

Watch this step (9:21)

Cured concrete slab with forms removed
Cured concrete slab with forms removed

You'll need: Hammer, Clamps

  1. 4.1 Unscrew and Remove Forms
    • Wait 1 week for the slab to cure before touching the mold.
    • Remove clamps and unscrew the fasteners holding the timber formwork strips (C).
    • Pry the timber sides off the concrete edges without chipping the corners.

Key measurements

  • Concrete cure time: 1 week minimum before removing formwork
  • Heads up: Stripping formwork before 1 week risks cracking or chipping green concrete edges.

Step 5: Initial Grinding and Polishing

Top cement paste ground off to expose stone aggregate and smoothed to 200 grit.

Watch this step (10:21)

Aggregate exposed after coarse grinding
Aggregate exposed after coarse grinding

You'll need: Angle Grinder, Variable Speed Angle Grinder, Diamond Polishing Pads

  1. 5.1 Grind the Surface
    • Fit a coarse grinding pad to the angle grinder.
    • Dry-grind the top to strip surface paste and expose stone aggregate.
    • Run the grinder along the vertical perimeter edges to match the top.
  2. 5.2 Polish with Coarse Diamond Pads
    • Fit the 50 grit diamond polishing pad to the variable speed angle grinder.
    • Set speed to setting 3, around 5,000 RPM, and smooth the slab.
    • Repeat on the top and vertical edges with the 100 and 200 grit pads.
Dry grinding and pad sequence
Dry grinding and pad sequence

Key measurements

  • Grinder speed setting: setting 3 (around 5,000 RPM out of 11,000 RPM)
  • Initial pad progression: coarse grinding disc, then 50, 100, and 200 grit diamond pads
  • Tip: Grind only when dry so dust clears and reveals high spots.
  • Heads up: Running polishing pads at 11,000 RPM flings pads off the backing plate at high speed.

Before you move on: Check for even aggregate exposure on the top and vertical edges before hardening.

Step 6: Apply Concrete Hardener

Saturate ground concrete pores with chemical hardener and cure overnight.

Watch this step (14:38)

Ground slab saturated with liquid hardener
Ground slab saturated with liquid hardener

You'll need: Paintbrush, Concrete Hardener & Dustproofer

  1. 6.1 Brush on the Hardener
    • Liberally pour concrete hardener and dustproofer on the dry ground slab.
    • Coat the top and vertical edges with the paintbrush.
    • Add a second liberal splash once the first sinks in.
    • Let hardener soak in and cure overnight to harden the concrete matrix.

Key measurements

  • Hardener cure time: overnight soak before final polishing
  • Tip: Saturating with hardener stops surface dusting during finer polishing.

Before you move on: Test that water or tea beads up without soaking into the concrete.

Step 7: Final Polishing Stages

Level and polish the hardened countertop to a glass-like sheen.

Watch this step (15:38)

Countertop polished to a smooth sheen
Countertop polished to a smooth sheen

You'll need: Variable Speed Angle Grinder, Diamond Polishing Pads, Paintbrush, Concrete Hardener & Dustproofer

  1. 7.1 Polish with Mid-Grit Pads
    • Circle high spots on the dry top with a crayon.
    • Brush on a fresh splash of concrete hardener and let dry.
    • Grind down the marked high spots until flat.
    • Polish top and vertical edges at low speed with 400 and 800 grit pads.
  2. 7.2 Final Polish with Fine-Grit Pads
    • Stop at 800 grit if dark brown spots appear.
    • Otherwise, make a final pass on top and edges with the 1500 grit pad.
    • Grind out dark patches with the 800 grit pad for a uniform sheen.

Key measurements

  • Final pad progression: 400, 800, and 1500 grit diamond polishing pads
  • Stopping grit to avoid dark spots: 800 grit
  • Tip: Over-polishing with a 1500 grit pad can bring up dark brown patches.

Before you move on: Sight the dry slab against the light for a uniform, glass-smooth glare.

Step 8: Clad the Base

Wrap the concrete block base in horizontal grey tongue and groove cladding with corner trim.

Watch this step (21:21)

Base wrapped in grey cladding
Base wrapped in grey cladding

Parts in this step: (E) Wooden battens, (A) Tongue and groove cladding, (F) Corner pieces

You'll need: Hammer Drill, Hammer, Paintbrush, Wooden Battens, Masonry Screws, Tongue and Groove Cladding, Grey Paint

  1. 8.1 Attach Wooden Battens
    • Set four vertical 900 mm wooden battens (E) across the front block wall.
    • Set one batten at each end and two across the middle to stop flexing.
    • Set three vertical battens across the side wall the same way.
    • Drill through battens into blocks with the hammer drill; fix with masonry screws.
  2. 8.2 Install Cladding
    • Cut pre-painted grey tongue and groove cladding (A) to span the walls.
    • Fix boards horizontally to the vertical battens from bottom to top.
    • Fit vertical corner pieces (F) over outside corners to cover board ends.

Key measurements

  • Vertical batten length: 900 mm
  • Front wall batten count: 4 battens (1 at each end, 2 in the middle)
  • Side wall batten count: 3 battens
  • Tip: Two front middle battens keep the cladding from bending or snapping.

Step 9: Seal the Countertop

Two brushed coats of paving seal lock and weatherproof the polished top.

Watch this step (25:40)

Finished countertop sealed with two coats
Finished countertop sealed with two coats

You'll need: Paintbrush, Paving Seal

  1. 9.1 Apply First Coat of Sealer
    • Pour paving seal onto the clean, dry polished concrete top.
    • Coat the top and vertical edges evenly with a clean paintbrush.
    • Let the first coat dry until slightly tacky.
  2. 9.2 Apply Second Coat of Sealer
    • Brush on a second coat of paving seal while the first is still tacky.
    • Cover the top and vertical edges without leaving puddles.
    • Let the sealed top dry and cure for a couple of days.
Hardener and paving seal cross-section
Hardener and paving seal cross-section

Key measurements

  • Sealer application count: 2 brushed coats
  • Recoat window: first coat slightly tacky
  • Final color cure time: 2 days
  • Tip: Applying the second coat while the first is tacky bonds the two coats.

Before you move on: Inspect wet edges; brush drips flat before the second coat sets.

Finishing

Trim & Details

Cure & Use

Alternatives

Check before you call it done

CheckWhat you should seeIf not
Run hand and spirit level over the polished concrete top and edges.Slab sits flat, feels glass-smooth, with even stone exposure.Circle high spots or dark patches; grind out with the 800 grit pad.
Splash liquid onto the hardened concrete.Liquid beads in a bubble on top without soaking into the concrete.Brush on another liberal coat of concrete hardener; let dry.
Press firmly on horizontal tongue and groove cladding between corners.Boards sit solid against the four front and three side battens without flexing.